国产精品一区二区久久不卡,婷婷伊人久久大香线蕉AV,A级黑粗大硬长爽猛出猛进,无码A∨高潮抽搐流白浆国产,欧美V亚洲V综合V国产V

公司新聞

當(dāng)前位置:首頁(yè) > 新聞中心 > 公司新聞

真空干燥機(jī)的調(diào)試方法是什么?

來(lái)源:http://owlshollowfarm.com/   日期:2021-06-21   瀏覽量:0
TAG:山東制氮機(jī),山東干燥機(jī),山東螺桿鼓風(fēng)機(jī),山東空壓機(jī),山東自動(dòng)排水器
一、抽真空調(diào)試方法
1、 Vacuum debugging method
調(diào)試前,我們需要關(guān)閉真空干燥機(jī)箱的門(mén),擰緊門(mén)把手,然后關(guān)閉放氣閥,打開(kāi)真空閥。當(dāng)然,一次使用時(shí),真空閥的開(kāi)關(guān)可能很緊,可以用力旋轉(zhuǎn)。我們可以使用隨機(jī)附件進(jìn)行真空連接管,牢固連接真空干燥的抽氣管和真空泵。當(dāng)接通真空泵電源時(shí),需要開(kāi)始抽氣,當(dāng)真空計(jì)的指示值達(dá)到-0.1Mpa時(shí),需要先關(guān)閉真空閥,然后再關(guān)閉真空泵電源,以防止真空泵中的油倒流到工作室內(nèi),這時(shí)真空干燥器內(nèi)部就處于真空狀態(tài)。
Before debugging, we need to close the door of the vacuum drying cabinet, tighten the door handle, then close the vent valve and open the vacuum valve. Of course, the switch of the vacuum valve may be very tight when it is used once, and it can be rotated by force. We can use the attached accessories to connect the vacuum pipe, and firmly connect the suction pipe and vacuum pump for vacuum drying. When the vacuum pump power is connected, it is necessary to start pumping. When the indication value of the vacuum gauge reaches -0.1mpa, it is necessary to close the vacuum valve first, and then turn off the power supply of the vacuum pump, so as to prevent the oil in the vacuum pump from flowing back into the working room. At this time, the vacuum dryer is in a vacuum state.
二、機(jī)內(nèi)調(diào)試方法
2、 Internal debugging method
先打開(kāi)真空干燥器的電源,然后它的電源燈亮起并進(jìn)行自檢,然后此時(shí)也就表明已進(jìn)入狀態(tài)。設(shè)定真空干燥機(jī)的溫度,設(shè)定機(jī)內(nèi)的溫度接近指定溫度時(shí),加熱開(kāi)始進(jìn)入PID調(diào)節(jié)階段,儀表測(cè)定溫度超過(guò)設(shè)定溫度,伸長(zhǎng)也低于設(shè)定溫度是正?,F(xiàn)象。
First turn on the power supply of the vacuum dryer, then its power light will light up and carry out self-test, and then it indicates that it has entered the state. Set the temperature of the vacuum dryer. When the temperature in the dryer is close to the specified temperature, the heating begins to enter the PID regulation stage. It is normal that the temperature measured by the instrument exceeds the set temperature and the elongation is lower than the set temperature.
因此,在測(cè)量溫度時(shí)如果已經(jīng)接近或等于設(shè)定溫度,再過(guò)1-2小時(shí)之后就幾乎可以進(jìn)入恒溫狀態(tài)。如果需要的溫度比較低,我們可以采用二次設(shè)定的方法,讓它盡快進(jìn)入恒溫狀態(tài)。
Therefore, if the measured temperature is close to or equal to the set temperature, it can almost enter the constant temperature state after 1-2 hours. If the required temperature is relatively low, we can use the secondary setting method to let it enter the constant temperature state as soon as possible.

上一篇:為什么要安裝羅茨鼓風(fēng)機(jī)消音器?
下一篇:PSA制氮機(jī)在氣體輔助注塑領(lǐng)域的應(yīng)用

国产精品一区二区久久不卡,婷婷伊人久久大香线蕉AV,A级黑粗大硬长爽猛出猛进,无码A∨高潮抽搐流白浆国产,欧美V亚洲V综合V国产V